1. EOC Report No.:
|
2. Prepared By:
|
3. Date and time posted:
|
4. Vermont Yankee has declared a(n):
at hours
due to EAL
|
5. Plant conditions: The plant is:
|
6. Radiological conditions:
A radiological release due to this event:
|
7. Present Meteorological Conditions
Wind Speed
mph
bWind Direction (from)
degrees
|
8. Extended Weather Forecast:
|
9.
Sirens to be sounded at
EAS to be initiated at
|
10. The Governor declared a state of emergency on:
|
11.
There has been a change in the protective or precautionary recommendations:
|
12.
The State Emergency Operations Center (SEOC) is at
|
13.
The Emergency Operations Facility (EOF) is
|